Free practice on Part P and the Building Regulations for electrical work in dwellings, the ground covered by the City & Guilds 2393 qualification and domestic installer assessments. 25 questions are drawn at random from a 54-question bank written from the Building Regulations 2010, Approved Document P (England and Wales) and the Approved Documents that affect electrical work: what is notifiable under regulation 12(6A), the special locations in regulation 12(9), self-certification, third-party certification and building control, socket and consumer unit heights (Part M), extract rates (Part F), lighting efficacy (Part L), EV charge points (Part S) and smoke alarms (Part B). Every explanation cites the paragraph it comes from.
- Questions
- 25
- Time limit
- 35 min
- Pass mark
- 70% · 18/25
- Question bank
- 54
Free, no sign-up. Retake as many times as you like — different questions each time.
Sample questions
01What does requirement P1 of Schedule 1 to the Building Regulations 2010 require?
- AEvery new circuit must be protected by an RCBO
- BReasonable provision in the design and installation of electrical installations to protect persons operating, maintaining or altering them from fire or injury
- CEvery electrical installation in a dwelling must be inspected every five years
- DAll electrical work in a dwelling must be carried out by a registered competent person
Why: Requirement P1 reads: reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury. It sets an outcome; it does not require periodic inspection or scheme membership.
02At what voltages does Part P apply?
- AHigh voltage only
- BOnly extra-low voltage installations
- CLow voltage and extra-low voltage installations
- DOnly 230 V single-phase installations
Why: Schedule 1 Part P applies only to electrical installations intended to operate at low or extra-low voltage that are in or attached to a dwelling, in the common parts of a building serving dwellings, or in a garden or outbuilding supplied from a dwelling.
03Which of these installations is OUTSIDE the scope of Part P?
- AA pond pump in the garden of a house
- BA detached garage supplied from the house
- CLighting in the common stairwell of a block of flats
- DA shop below a flat with its own separate electricity meter
Why: Approved Document P paragraph 2.3 says Part P does not apply to business premises in the same building as a dwelling but with separate metering. Common areas of flats, garden installations and outbuildings supplied from the dwelling are all within scope (paragraph 2.2).
Common questions
Is the Part P & Building Regulations mock exam free?
Yes — 100% free, no sign-up needed. Questions are pulled at random from a substantial bank, with a worked explanation on every question after you submit.
Can I retake the mock exam?
Yes. Every attempt picks a different random selection and reshuffles the options, so each retake gives you genuinely new questions. No limit on retakes.
Does this count towards the real qualification?
No — this is independent practice material. To gain the actual qualification you need to sit the official assessment through an approved provider.
What electrical work is notifiable under Part P in England?
Regulation 12(6A) of the Building Regulations 2010 lists three things: installing a new circuit, replacing a consumer unit, and any addition or alteration to existing circuits in a special location. The special locations are the space around a bath or shower (0.6 m from the bath or tray, up to 2.25 m high) and a room containing a swimming pool or sauna heater. Kitchens and gardens are not special locations in England.
Is the Part P list different in Wales?
Yes. The Welsh Approved Document P still treats work in kitchens, and special installations such as outdoor lighting and power, solar PV and floor heating, as notifiable. In large bathrooms the location is defined by the walls of the room.
How long does a registered competent person have to notify building control?
Approved Document P paragraph 3.4: within 30 days of completing the work, the installer or their registration body must give the occupier a copy of the Building Regulations compliance certificate and give building control the certificate or its information.