The Electrical Installation Certificate (EIC) under BS 7671:2018+A4:2026 has new sections, new earthing-arrangement tick-boxes, an expanded Schedule of Inspections (items 1.0 through 14.0 including the new Prosumer LV installation item) and updated terminology. This guide walks every change visible on the canonical IET form.

Free for 7 days · No charge until day 8 · Cancel anytime · Used by 1,000+ UK electricians

12 min readUpdated 2026-06-10Andrew Moore, Founder of Elec-Mate

Written and reviewed by Andrew Moore, founder of Elec-Mate, against BS 7671:2018+A4:2026, IET Guidance Note 3 and the IET On-Site Guide.

ShareXinW
Follow

What changed on the BS 7671 A4:2026 Electrical Installation Certificate (EIC)?

The A4:2026 EIC adds item 14.0 "Prosumer's low voltage electrical installation(s)" to the Section H Schedule of Inspections (now 1.0 to 14.0), splits the TN-C-S earthing tick-box into PME and PNB, and keeps the three-signatory Design / Construction / Inspection & Testing structure. Item 6.0 now covers the new 30 mA RCD requirement for domestic luminaire final circuits (Regulation 411.3.4).

1,000+

UK electricians

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer — DP Electrical

Key Takeaways

  • 1The EIC is the certificate issued for new electrical installations, additions and alterations — it is NOT the same as the EICR (which records the condition of an existing installation).
  • 2Section H Schedule of Inspections under A4:2026 covers items 1.0 through 14.0 — item 14.0 is the new "Prosumer's low voltage electrical installation(s)" inspection point.
  • 3Section F earthing-arrangement tick-boxes now distinguish TN-C-S (PME) from TN-C-S (PNB) — same change as on the EICR.
  • 4Section C splits certification responsibility into Design, Construction, and Inspection & Testing — three separate signatures with separate liability statements per Regulations 120.3, 133.1.2, 133.1.3 and 133.5.
  • 5Section G records Means of Earthing, Maximum Demand, Earth Electrode details, Main Protective Conductors and Main Switch in one consolidated block.
  • 6Schedule of Circuit Details and Schedule of Test Results that accompany the EIC use the same updated layout as the EICR — reference method, maximum permitted Zs, SPD type per board, and a dedicated AFDD test column.
01 · A4:2026 EIC Model Form

What an EIC Is and When You Issue One

An Electrical Installation Certificate (EIC) is issued for new electrical installation work, additions, and alterations to an existing installation. It is the design-construction-inspection record of work being put into service, and it must be issued under BS 7671 before the installation can be safely energised and used.

EIC vs EICR — different documents, different purposes

The EIC certifies new work or alterations meeting BS 7671. The EICR (Electrical Installation Condition Report) records the condition of an existing installation at a point in time. The EIC has design and construction signatures; the EICR has inspection and testing signatures only.

  • **New installation** — the initial certification of a complete new installation. Issue an EIC.
  • **Addition or alteration introducing a new circuit** — extending an existing installation with one or more new circuits. Issue an EIC.
  • **Consumer unit / distribution board replacement** — a board swap is explicitly an EIC job under the A4:2026 form notes, even where no new final circuit is added.
  • **Multiple additions / alterations / remedial works that do not extend to new circuits** — may be certified on a single EIC as an alternative to issuing multiple MEIWCs.
  • **Minor work with no new circuit** — a single small alteration that does not introduce a new circuit is documented on the Minor Electrical Installation Works Certificate (MEIWC) instead.
  • **Periodic inspection of an existing installation** — never an EIC. Use an EICR (Electrical Installation Condition Report).

The original EIC is issued to the person ordering the work and a duplicate is retained by the person issuing the certificate (Regulation 644.4). The certificate is only valid once the Schedule of Inspections is completed and the relevant Schedule(s) of Circuit Details and Schedule(s) of Test Results are attached (Regulation 644.3).

Free download

Get the BS 7671 A4:2026 Cheat Sheet — free

Every key change in the 2026 amendment on one page. AFDDs, TN-C-S protection, new schedule columns, model forms. Pinned on your van dash.

  • Every regulation change summarised
  • New model forms (EIC + MEIWC)
  • Free PDF — no subscription

We'll email it once. No spam — unsubscribe any time.

02 · A4:2026 EIC Model Form

Section C — Three Separate Certification Signatories

A4:2026 retains the three-signatory structure that distinguishes EIC liability. Each role attests to compliance with BS 7671:2018 amended to the relevant date, subject to any documented departures (Regulations 120.3, 133.1.2, 133.1.3 and 133.5):

  • **For Design** — Designer 1 (and Designer 2 where mutual responsibility for design exists). Attests that the design work is compliant. Departures from BS 7671 and permitted exceptions per Regulation 411.3.3 (with attached risk assessment) are recorded here.
  • **For Construction** — Constructor. Attests that the installation has been constructed in accordance with the design and BS 7671. Departures from BS 7671 detected during construction are recorded.
  • **For Inspection and Testing** — Inspector. Attests that the inspection and testing work has been carried out in accordance with BS 7671 and the Schedule of Inspections.

Section E expands signatory details

Section E records full name, address, postcode and telephone number for each signatory in Section C (Designer 1, Designer 2 where applicable, Constructor, Inspector). This makes the chain of responsibility for the installation explicit — critical for warranty, insurance and future investigation.

03 · A4:2026 EIC Model Form

Section F — Earthing Arrangement (PME vs PNB)

Section F of the A4:2026 EIC has the same earthing-arrangement tick-box list as the EICR:

  • TN-C — combined PEN throughout (rare in UK).
  • TN-S — separate N and PE throughout.
  • TN-C-S (PME) — distributor's combined PEN, Protective Multiple Earthing on the distribution network.
  • TN-C-S (PNB) — privately-owned combined PEN, Protective Neutral Bonding downstream of a privately-owned transformer.
  • TT — installation earth electrode, no distributor earth.
  • IT — isolated/IT system.

Other supply parameters in this section: Number and type of live conductors (AC: 1-, 2-, 3-phase 3-wire or 4-wire, with confirmation of polarity; DC: 2-wire or 3-wire), nominal voltage U/U₀, frequency, prospective fault current Ipf, external earth fault loop impedance Ze, and the supply protective device characteristics (BS EN, type, rated current, breaking capacity).

04 · A4:2026 EIC Model Form

Section G — Particulars of Installation

Section G consolidates the installation's headline characteristics in one block:

  • **Means of Earthing** — tick-box for Distributor's facility or Installation earth electrode.
  • **Maximum Demand (load)** — recorded in kVA or A (delete as appropriate).
  • **Details of Installation Earth Electrode** — where applicable: type (rod, tape etc.), location, and electrode resistance / impedance R_A or Z_e.
  • **Main Protective Conductors** — earthing conductor material and CSA, main protective bonding conductor material and CSA, with connection/continuity verified tick-boxes.
  • **Bonding destinations** — tick-boxes for water, gas, oil installation pipes, structural steel, lightning protection system, and "Other" with specify field.
  • **Main switch (Isolation device / Switch-fuse / Circuit-breaker / RCD etc.)** — location, BS EN, number of poles, current rating, voltage rating, plus either overcurrent device details OR RCD main switch details (Type AC/A/F/B, rated residual operating current IΔn, rated time delay, measured operating time, breaking capacity).

Try Elec-Mate free for 7 days

16 certificate types, 70+ calculators, RAMS, quoting, invoicing, AI agents, and 46+ training courses — from £6.99/mo.

Start free trial
Download on the App StoreGet it on Google Play
05 · A4:2026 EIC Model Form

Section H — Schedule of Inspections (Items 1.0 to 14.0)

The A4:2026 EIC Schedule of Inspections in Section H lists 14 inspection items, each requiring an "Outcome (✓ / N/A)" entry:

  • **1.0 Condition of consumer's intake equipment (Visual inspection only)** — supplier's cut-out, distributor's seal, isolation device for the consumer.
  • **2.0 Parallel or switched alternative sources of supply** — generator backup, UPS, prosumer arrangements with separate supply origins.
  • **3.0 Protective measure: Automatic Disconnection of Supply (ADS)** — earthing arrangement, protective device selection, disconnection time verification.
  • **4.0 Basic protection** — insulation of live parts, barriers and enclosures.
  • **5.0 Protective measures other than ADS** — SELV/PELV, double or reinforced insulation, electrical separation.
  • **6.0 Additional protection** — 30 mA RCDs on socket-outlets not exceeding 32 A (411.3.3), cables concealed in walls at a depth of less than 50 mm (522.6.202, Table 52.1), and the new requirement for domestic luminaire final circuits (411.3.4).
  • **7.0 Distribution equipment** — consumer unit / distribution board condition, suitability, identification.
  • **8.0 Circuits (Distribution and Final)** — circuit wiring, cable types, segregation.
  • **9.0 Isolation and switching** — emergency switching, functional switching, mechanical maintenance isolation.
  • **10.0 Current-using equipment (permanently connected)** — fixed equipment selection and connection.
  • **11.0 Identification and notices** — circuit charts, warning labels, periodic inspection notice.
  • **12.0 Location(s) containing a bath or shower** — Section 701 compliance.
  • **13.0 Other special installations or locations** — Part 7 compliance for whichever sections apply.
  • **14.0 Prosumer's low voltage electrical installation(s)** — NEW under A4:2026.

EIC outcomes are ✓ / N/A — not condition codes

On the EIC each Schedule of Inspections item takes a simple Outcome entry — a tick to confirm the item is satisfactory, or N/A where it does not apply. This is initial verification of new work, so there are no observation classification codes. The C1 / C2 / C3 / FI condition codes belong to the EICR, which assesses an existing installation. See the A4:2026 Schedule of Tests changes for the measurement columns that accompany this inspection.

06 · A4:2026 EIC Model Form

New Item 14.0 — Prosumer's LV Installation

Item 14.0 is the most distinctive new inspection point on the A4:2026 EIC. A4:2026 introduces an entirely new Chapter 82 covering Prosumer's Electrical Installations (PEIs) — low voltage installations that both consume energy from the supply AND produce or store energy that may be exported. BS 7671 defines a prosumer as an entity that can be both a producer and a consumer of electrical energy, combining functions traditionally separated into "consumer" and "generator" installations.

  • Solar PV + battery storage + grid connection — the canonical prosumer arrangement.
  • Wind generation + battery + grid for self-consumption with export.
  • EV-to-grid (V2G) charging where the vehicle battery exports back to the supply at times.
  • Combined heat and power (CHP) with grid synchronisation.
  • Hybrid solar/battery installations with islanding capability for grid-fault back-up.

Why prosumer inspection got its own item

Prosumer installations have bidirectional power flow, anti-islanding protection requirements (G98/G99 compliance for grid connection), specific earthing considerations, additional disconnection and isolation requirements, and labelling needs that distinguish "switched off" from "isolated from generation". A dedicated inspection item makes these checks visible and traceable on every EIC.

07 · A4:2026 EIC Model Form

Section D — Next Inspection Recommendation

Section D of the EIC records the designer's recommended periodic inspection interval — the time after which the responsible person should commission the next EICR. The interval is expressed in years or months and is influenced by:

  • Installation type (domestic, commercial, industrial, special location).
  • Foreseeable change of use within the recommended interval.
  • Tenant turnover frequency for rented properties (PRS Regs 2020 implications in England).
  • Equipment sensitivity (medical, life-safety, computing infrastructure).
  • Environmental conditions (corrosive, wet, high-temperature).

Typical intervals (IET Guidance Note 3)

Domestic owner-occupied: 10 years. Domestic rented: 5 years (statutory under PRS Regs 2020 in England). Commercial: 5 years. Hospitals: 1 year. Caravan parks / marinas: 1 year. Agricultural / horticultural: 3 years (1 year if particularly harsh).

Frequently Asked Questions

What electricians say

Verified reviews from the UK App Store.

One App for Everything!

Elec-Mate is my go to app for business and electrical work. It's feature rich without feeling cluttered. A true all in one app for quotes, certs, calculations, RAMS, EICRs, and more. I use it every day without fail, and it makes my workflow much smoother since I'm not jumping between apps anymore. The price-to-feature ratio is excellent. Any issues I've had, the developer responds within the hour and usually fixes them the same day. 100% recommend.

Apple App Store · GBR

Fantastic app for electricians

I've used the app and the web based version for a while now and it's well worth the investment. If you're an apprentice or experienced Spark give it a go, you won't be disappointed.

Apple App Store · GBR

Absolutely amazing

I've been using Elec-Mate for a while now, and honestly, it's one of the best apps I've ever downloaded. Every aspect of it feels thoughtfully designed, from the clean and intuitive interface to the powerful features that make everything so easy to manage. It's clear that a lot of care and attention went into building this app, and it shows in every detail.

Apple App Store · GBR

Trusted by electricians across the UK

Real feedback from real sparks

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer

Sole Trader · DP Electrical

“I've won two contracts this month because I could turn quotes around same-day with the AI cost engineer.”

Nathan Perry

Electrician · NP Electrical Services

“The study centre got me through my AM2. Mock exams and flashcards are brilliant.”

Jake Pizey

3rd Year Apprentice · Apprentice

7-Day Free Trial — Cancel Anytime, No Hassle

Issue compliant A4:2026 EICs

Elec-Mate ships the full A4:2026 EIC model form — three-signatory workflow, 14 Schedule of Inspections items, prosumer-aware item 14.0, all schedules attached. 7-day free trial.

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical

From £6.99/mo after trial — less than a coffee a week

or download the app
Download on the App StoreGet it on Google Play
7 days free, then from £6.99/moCancel in one tap — no calls, no hassleiOS, Android & WebBS 7671 compliant
16
Certificate Types
70+
Calculators
46+
Training Courses
8
AI Agents

1,000+ electricians · From £6.99/mo after trial

We use cookies to improve the app and measure what works. Cookie Policy