Method Statement for Electrical Work: Template and Guide

The complete guide to writing method statements for electrical work in the UK. What to include, when required, common method statements for rewires, consumer unit changes, testing, and EV charger installations, and how method statements fit with risk assessments to form RAMS packs.

Free for 7 days · No charge until day 8 · Cancel anytime · Used by 1,000+ UK electricians

19 min readUpdated 2026-06-10Andrew Moore, Founder of Elec-Mate

Written and reviewed by Andrew Moore, founder of Elec-Mate, against BS 7671:2018+A4:2026, IET Guidance Note 3 and the IET On-Site Guide.

ShareXinW
Follow

What is a method statement for electrical work?

A method statement is a written, step-by-step description of how a specific electrical job will be carried out safely — from site set-up through safe isolation, installation, testing and handover. It states what is done at each stage, who does it, the equipment used and the safety controls in place. Paired with a risk assessment it forms a RAMS pack, the standard document clients and principal contractors require before work begins.

1,000+

UK electricians

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer — DP Electrical

Key Takeaways

  • 1A method statement is a step-by-step description of how work will be carried out safely — it describes the sequence of operations, resources required, and safety precautions at each stage.
  • 2Method statements are required for any significant electrical work and are universally expected by principal contractors, commercial clients, and building managers before work can begin on site.
  • 3The method statement must be specific to the job and site — generic template method statements that do not address the actual work being done are increasingly being rejected by safety-conscious clients.
  • 4Together with the risk assessment, the method statement forms a RAMS pack (Risk Assessment and Method Statement) — the standard safety document package for electrical contracting.
  • 5Elec-Mate generates professional, site-specific method statements from a plain-English job description in under 60 seconds using its AI Health and Safety agent and RAMS Generator.
  • 6Post-A4:2026 method statements for domestic consumer unit changes and rewires must address two new design checkpoints: AFDDs on socket-outlet final circuits not exceeding 32 A (Reg 421.1.7 — a requirement in higher-risk residential buildings, HMOs, purpose-built student accommodation and care homes; recommended elsewhere) and RCD protection not exceeding 30 mA on all final circuits supplying luminaires in domestic premises (Reg 411.3.4, mandatory).
  • 7Safe isolation described in a method statement must follow the OSG Reg 12.5 minimum three-stage sequence before testing dead: (1) positively identify the isolation point, (2) check the VID condition, (3) confirm VID functioning on a known live source.
01 · Safety Hub

What Is a Method Statement?

A method statement is a written document that provides a step-by-step description of how a piece of work will be carried out safely. It follows the chronological sequence of the job from start to finish, describing at each stage what work is being performed, what safety precautions are in place, what equipment is being used, and who is responsible.

Think of a method statement as the instruction manual for a safe job. Where a risk assessment identifies the hazards and specifies the control measures, the method statement describes how those controls are implemented within the practical sequence of work. The risk assessment says "safe isolation is required before working on conductors"; the method statement describes exactly how that safe isolation will be carried out — at which distribution board, on which circuit, using what voltage indicator, with what lock-off devices.

A good method statement has three qualities: it is specific (it describes the actual work on the actual site, not a generic template), it is sequential (it follows the natural order of the work from mobilisation to completion), and it is practical (it describes what will actually happen on site, not an unrealistic ideal that nobody follows).

Free download

Get the BS 7671 A4:2026 Cheat Sheet — free

Every key change in the 2026 amendment on one page. AFDDs, TN-C-S protection, new schedule columns, model forms. Pinned on your van dash.

  • Every regulation change summarised
  • New model forms (EIC + MEIWC)
  • Free PDF — no subscription

We'll email it once. No spam — unsubscribe any time.

02 · Safety Hub

When Is a Method Statement Required?

A method statement is expected for any significant electrical work. While there is no single regulation that requires a "method statement" by name, the duty to plan, manage, and monitor work safely under CDM 2015 and the MHSWR 1999 is in practice fulfilled by producing a method statement.

Method Statements Are Expected For

  • All work on commercial and industrial sites (universally required by principal contractors)
  • Any notifiable work under CDM 2015 (projects lasting more than 30 working days with more than 20 workers, or exceeding 500 person-days)
  • Work in managed residential buildings (housing associations, local authorities, managing agents)
  • Consumer unit changes, rewires, and new installations in domestic properties (best practice)
  • Any work involving high-risk activities (live working, confined spaces, working at height)
  • EV charger installations (OZEV grant compliance and DNO notification requirements)

In practice, producing a method statement for every job — including domestic work — is good business practice as well as good safety practice. It demonstrates professionalism, gives the customer confidence in your approach, and provides documented evidence of your safe system of work in the event of any future dispute or investigation.

03 · Safety Hub

What to Include in an Electrical Method Statement

An effective method statement covers the complete work process from mobilisation to handover. While the specific content varies with the type and complexity of the work, every electrical method statement should include the following core elements.

Header Information

Project name and address, client name, contractor details, document reference number, revision number and date, author name and qualification, scope of work description, and duration of works. This information identifies the document and links it to the specific project.

Resources

Personnel required (number, qualifications, competence requirements), tools and equipment (test instruments, power tools, access equipment), materials (specification and quantities), and PPE requirements (type, standard, rating). All resources must be identified before work begins to prevent improvisation on site.

Sequence of Operations

The step-by-step work sequence in chronological order. Each step describes the work activity, the safety precautions in place, the quality checks required, and who is responsible. For electrical work, this typically covers: site induction and set-up, safe isolation, first fix (containment and cabling), second fix (accessories and terminations), testing and commissioning, and handover.

Emergency Procedures

Actions in the event of electric shock, fire, injury, or other emergency. Location of first aid equipment, defibrillator, and fire extinguisher. Emergency contact numbers. Evacuation routes and assembly points. Name of the designated first aider.

Waste Management

How waste materials will be handled and disposed of. Segregation of waste types (general, electrical, hazardous). Disposal of old cables, consumer units, and components. WEEE (Waste Electrical and Electronic Equipment) disposal requirements. Asbestos waste handling if asbestos-containing materials are encountered.

04 · Safety Hub

How to Write an Effective Method Statement

Writing an effective method statement requires a balance between sufficient detail and practical readability. The document must be detailed enough to describe a safe sequence of work but concise enough that the people doing the work will actually read it.

Start by walking through the job mentally (or physically, if you have access to the site) from arrival to departure. At each stage, ask yourself: what am I doing, what could go wrong, what precautions do I need, and what equipment do I need? Write each stage as a numbered step in clear, plain language.

Use specific, measurable language rather than vague generalities. Instead of "ensure safe isolation is carried out," write "isolate Circuit 3 at MCB position 6 in DB-1, apply lock-off device and personal padlock, prove dead using GS 38 compliant two-pole voltage indicator (prove-test-prove), and attach warning label." This level of specificity demonstrates that you have actually planned the work rather than copied a template.

Include safety hold points — critical checkpoints where work must stop until a specific safety condition is verified. Common electrical hold points include: safe isolation verified before working on conductors, insulation resistance confirmed satisfactory before energising new circuits, and all covers and barriers replaced before leaving the work area unattended.

AI writes method statements from your job description

Describe your job in plain English — 'Full rewire of a 1930s three-bed semi, TN-S supply…

Try it free for 7 days
Download on the App StoreGet it on Google Play
05 · Safety Hub

Common Electrical Method Statements

While every method statement must be site-specific, certain types of electrical work are common enough that standard method statement structures can be identified. Here are the key sections you would expect in method statements for the most common electrical jobs.

Domestic Rewire

  1. 1Mobilisation, customer briefing, and agreement of working hours and access
  2. 2Asbestos assessment (mandatory consideration in pre-2000 properties)
  3. 3Existing installation survey and circuit identification
  4. 4Temporary supply arrangements where the customer remains in residence
  5. 5Safe isolation of existing circuits before any disconnection
  6. 6First fix — cable routes, containment, and cabling with fire stopping at every penetration
  7. 7Consumer unit installation and termination in a non-combustible enclosure (Reg 421.1.201)
  8. 8Second fix — accessories, terminations, and final connections
  9. 9Initial verification — dead and live tests in the BS 7671 sequence
  10. 10Building control notification under Part P via a competent person scheme
  11. 11Customer handover with the EIC and operating instructions

A4:2026 Design & Commissioning Checkpoints

  • AFDDs (Reg 421.1.7): arc fault detection devices are a requirement on socket-outlet final circuits rated up to 32 A in higher-risk residential buildings, HMOs, purpose-built student accommodation and care homes, and are recommended for single-phase socket-outlet circuits up to 32 A elsewhere. Record the AFDD decision in the method statement.
  • RCD on luminaires (Reg 411.3.4): within domestic premises, additional protection by an RCD with a rated residual operating current not exceeding 30 mA shall be provided for AC final circuits supplying luminaires. Verify this at commissioning before completing the EIC.

Consumer Unit Change

  1. 1Site assessment and review of the existing installation
  2. 2Safe isolation of the incoming supply (coordinate with the DNO if the service fuse must be pulled)
  3. 3Removal of the existing consumer unit
  4. 4Installation of the new non-combustible (e.g. ferrous metal) consumer unit per Reg 421.1.201
  5. 5Circuit transfer and termination to the correct manufacturer torque settings
  6. 6Labelling of every circuit and the main switch
  7. 7Initial verification — dead and live tests
  8. 8Completion of the Electrical Installation Certificate (EIC)
  9. 9Part P building control notification
  10. 10Customer handover, addressing the period when the supply was isolated and power was lost

A4:2026 Design & Commissioning Checkpoints

  • AFDDs (Reg 421.1.7): confirm whether AFDDs are required (socket-outlet circuits up to 32 A in higher-risk residential buildings, HMOs, purpose-built student accommodation and care homes) or recommended (single-phase socket-outlet circuits up to 32 A elsewhere), and record the decision.
  • RCD on luminaires (Reg 411.3.4): verify that all final circuits supplying luminaires in domestic premises are protected by a 30 mA RCD before completing the EIC.

EICR (Electrical Installation Condition Report)

  1. 1Pre-inspection consultation — scope, access requirements, and shutdown arrangements
  2. 2Visual inspection of the installation
  3. 3Safe isolation in preparation for dead testing
  4. 4Dead tests in the GN3 sequence — continuity, insulation resistance, polarity
  5. 5Re-energise and carry out live tests — earth fault loop impedance (Zs), prospective fault current, RCD operation
  6. 6Record all measured results
  7. 7Classify observations using codes C1, C2, C3 and FI
  8. 8Complete the EICR form
  9. 9Handover and explanation of findings to the client

EV Charger Installation

  1. 1Site survey — supply capacity, maximum demand calculation, cable route, and charger location
  2. 2DNO notification (G98/G99 application where required)
  3. 3Cable sizing calculation including voltage drop
  4. 4Installation of a dedicated circuit from the consumer unit to the charge point
  5. 5Cable containment and mechanical protection
  6. 6Earth electrode installation where a TT system or supplementary earthing is required
  7. 7Charger mounting and connection
  8. 8Testing and commissioning
  9. 9Completion of the EIC
  10. 10OZEV grant paperwork where applicable, then customer handover and operating instructions

A4:2026 Commissioning Checkpoint

  • Load curtailment (Reg 722.311.201): load curtailment — including load reduction or disconnection, automatically or manually — may be taken into account when determining maximum demand of the installation or part thereof. Where a dynamic load management device is fitted, record the curtailment scheme and confirm its correct operation at commissioning.

Generate RAMS in minutes

Site-specific risk assessments and method statements, written to CDM 2015 expectations and ready to send. From £6.99/mo.

Try the safety tools free
Download on the App StoreGet it on Google Play
06 · Safety Hub

Relationship to Risk Assessment

The method statement and risk assessment are two halves of the same safety document package. The risk assessment identifies the hazards and specifies what control measures are needed; the method statement describes how those controls are implemented within the practical sequence of work. Neither document is complete without the other.

Risk Assessment

  • Answers "what could go wrong, and what will we do about it?"
  • Identifies hazards and the people at risk
  • Scores risk on a likelihood-times-severity matrix
  • Specifies control measures and the hierarchy of controls
  • Completed first — it defines the controls

Method Statement

  • Answers "how exactly will we do this work safely?"
  • Describes the chronological sequence of operations
  • States the safety precautions at each stage
  • Embeds the risk assessment controls into the work process
  • Written second — it implements the controls

The relationship is directional: the risk assessment must be completed first because it identifies the controls that the method statement must incorporate. If the risk assessment identifies "safe isolation required before working on conductors" as a control measure, the method statement must describe exactly how safe isolation will be carried out, at which point in the work sequence, and with what equipment.

When reviewing method statements, clients and safety teams check that every control measure identified in the risk assessment appears in the method statement at the appropriate point. If the risk assessment says "RPE required during chasing" but the method statement describes the chasing process without mentioning RPE, the documents are inconsistent and will be rejected.

Elec-Mate's AI generates both documents together as a coherent RAMS pack, ensuring that the control measures in the risk assessment are automatically reflected in the method statement. This eliminates the inconsistency that often occurs when the two documents are written separately or by different people.

07 · Safety Hub

RAMS: The Complete Safety Pack

RAMS stands for Risk Assessment and Method Statement — two separate documents presented together as a single safety pack. When a principal contractor or client asks for "your RAMS," they expect to receive both the risk assessment and the method statement for the specific work being carried out on their specific site.

A complete RAMS pack for electrical work typically contains the following parts.

Cover sheet

Project details, contractor information, and document control (reference, revision, date).

Risk assessment

Hazard identification, risk matrix scoring, control measures, and the hierarchy of controls.

Method statement

Step-by-step work sequence, safety precautions at each stage, and emergency procedures.

COSHH assessments

Where hazardous substances are involved — for example resins, solvents, or dust from chasing.

Appendices

Site plans, circuit diagrams, competence records, and insurance certificates.

The quality of your RAMS directly affects your ability to win work. Principal contractors and safety teams review RAMS for substance and specificity — they can immediately identify generic template documents that have not been adapted for the actual job. Poor RAMS reflect poorly on the contractor and may result in rejection and loss of the contract. Conversely, well-written, site-specific RAMS demonstrate competence and professionalism, building confidence with clients and safety teams.

Generate complete RAMS packs with AI

Elec-Mate's AI Health and Safety agent generates complete, site-specific RAMS packs from a plain-English job description.

Try it free for 7 days
Download on the App StoreGet it on Google Play
08 · Safety Hub

Common Method Statement Mistakes

Method statements fail when they are treated as a box-ticking exercise rather than a genuine planning tool. These common mistakes undermine the document's value and may result in rejection by clients and safety teams.

Using generic templates without customisation

A method statement that says "carry out electrical installation work" without specifying what work, where, or how is not a method statement — it is a blank page with a header. Generic templates must be thoroughly customised for each job and site. If the document does not mention the specific property address, the specific circuits, and the specific equipment, it has not been customised enough.

Inconsistency with the risk assessment

If the risk assessment identifies "working at height — use podium steps" as a control measure, but the method statement describes installing ceiling lights from a ladder, the documents are inconsistent. Every control measure in the risk assessment must be reflected in the method statement. Safety teams check for these inconsistencies and will reject the RAMS pack if they find them.

Not describing safe isolation specifically

"Carry out safe isolation" is not a method statement instruction. The method statement must describe the full safe isolation procedure, following the minimum sequence set out in OSG Reg 12.5: (1) locate and positively identify the correct isolation point; (2) check the physical condition of the voltage indicating device (VID) for obvious damage or deterioration; (3) confirm the VID is functioning correctly on a known live source; (4) test the circuit dead at the point of work (L-N, L-E, N-E); (5) confirm the VID on the known live source again (prove-test-prove). Apply lock-off device and personal padlock before beginning work.

Omitting testing and commissioning

Many method statements describe the installation in detail but gloss over testing with a single line: "carry out testing as per BS 7671." The testing and commissioning phase has its own hazards (repeated isolation and re-energisation cycles) and its own sequence (dead tests before live tests, specific test order per GN3). This phase must be described in the same level of detail as the installation phase.

No emergency procedures

Every method statement must include emergency procedures. What happens if someone receives an electric shock? What if there is a fire? Where is the nearest first aid equipment? Who is the designated first aider? What is the emergency assembly point? These are not afterthoughts — they are essential elements that the workforce must know before starting work.

How to Write an Electrical Method Statement

The step-by-step process for creating effective, site-specific method statements for electrical work.

1

Define the scope of work

Clearly describe what work is to be carried out, where, and when. Be specific: "Installation of new 18-way metal consumer unit (AMD3 type) replacing existing 8-way plastic consumer unit at 42 Oak Road, Ground Floor Hallway Cupboard. Supply: single-phase 100 A TNS. Duration: 1 day." The scope defines the boundaries of the method statement — work outside this scope needs its own assessment.

2

List resources required

Document the personnel (number of people, qualifications, competence requirements), tools and equipment (test instruments, power tools, hand tools, access equipment), materials (consumer unit, cables, accessories, containment), and PPE required. Include specific requirements such as "GS 38 compliant two-pole voltage indicator" and "insulated tool kit to BS EN 60900." This ensures everything is available before work begins and nothing is improvised on site.

3

Write the step-by-step sequence

Describe the work in chronological order from arrival on site to handover. Each step should describe what is being done, who is doing it, what safety precautions apply at that stage, and what equipment is being used. Include critical safety checkpoints such as safe isolation verification following the OSG Reg 12.5 minimum sequence — positively identify the isolation point, check VID condition, confirm VID on a known live source, test dead, confirm VID again — insulation resistance testing before energising, and correct GS 38 prove-test-prove before working on any conductors. The sequence must be logical and workable — it should reflect how the work will actually be done, not an idealised version that bears no relation to site reality.

4

Include emergency procedures

Document what to do if something goes wrong. Location of the nearest first aid kit and defibrillator. Name and contact number of the site first aider. Emergency services contact procedure. Action in the event of electric shock (isolate supply, do not touch the casualty if still in contact, call 999, begin CPR if qualified). Action in the event of fire (raise the alarm, evacuate, call 999, do not fight fires beyond your training). Location of emergency assembly point.

5

Review and approve

Have the method statement reviewed by a competent person before issuing it. Check that the sequence is logical, the safety precautions are adequate, the resources are realistic, and the document is specific to the actual job and site. On commercial sites, the method statement will be reviewed by the principal contractor or their safety team as part of the RAMS approval process. Incorporate their feedback and resubmit if required. Only begin work after the method statement has been approved.

Frequently Asked Questions

What electricians say

Verified reviews from the UK App Store.

One App for Everything!

Elec-Mate is my go to app for business and electrical work. It's feature rich without feeling cluttered. A true all in one app for quotes, certs, calculations, RAMS, EICRs, and more. I use it every day without fail, and it makes my workflow much smoother since I'm not jumping between apps anymore. The price-to-feature ratio is excellent. Any issues I've had, the developer responds within the hour and usually fixes them the same day. 100% recommend.

Apple App Store · GBR

Fantastic app for electricians

I've used the app and the web based version for a while now and it's well worth the investment. If you're an apprentice or experienced Spark give it a go, you won't be disappointed.

Apple App Store · GBR

Absolutely amazing

I've been using Elec-Mate for a while now, and honestly, it's one of the best apps I've ever downloaded. Every aspect of it feels thoughtfully designed, from the clean and intuitive interface to the powerful features that make everything so easy to manage. It's clear that a lot of care and attention went into building this app, and it shows in every detail.

Apple App Store · GBR

Trusted by electricians across the UK

Real feedback from real sparks

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer

Sole Trader · DP Electrical

“I've won two contracts this month because I could turn quotes around same-day with the AI cost engineer.”

Nathan Perry

Electrician · NP Electrical Services

“The study centre got me through my AM2. Mock exams and flashcards are brilliant.”

Jake Pizey

3rd Year Apprentice · Apprentice

7-Day Free Trial — Cancel Anytime, No Hassle

Generate method statements with AI in seconds

Join 1,000+ UK electricians using Elec-Mate for AI-powered method statements, risk assessments, and complete RAMS packs. 7-day free trial, cancel anytime.

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical

From £6.99/mo after trial — less than a coffee a week

or download the app
Download on the App StoreGet it on Google Play
7 days free, then from £6.99/moCancel in one tap — no calls, no hassleiOS, Android & WebBS 7671 compliant
16
Certificate Types
70+
Calculators
46+
Training Courses
8
AI Agents

1,000+ electricians · From £6.99/mo after trial

We use cookies to improve the app and measure what works. Cookie Policy