BS 7671 A4:2026 UPDATE

Section 722 EV Charging — What A4:2026 Actually Changed

Amendment 4 to BS 7671:2018, published on 15 April 2026, reorganised Section 722 from the ground up. This guide is the clause-by-clause reading every UK installer needs — RDC-DD 6 mA DC detection, PME (TN-C-S) earthing for charge points, outdoor IP ratings, Type B versus Type A RCD selection, discrimination, bidirectional V2G implications, and how the EIC must record it all.

Free for 7 days · No charge until day 8 · Cancel anytime · Used by 1,000+ UK electricians

16 min readUpdated 2026-06-10Andrew Moore, Founder of Elec-Mate

Written and reviewed by Andrew Moore, founder of Elec-Mate, against BS 7671:2018+A4:2026, IET Guidance Note 3 and the IET On-Site Guide.

ShareXinW
Follow

What did A4:2026 change in Section 722 for EV charging?

Amendment 4:2026 (issued 15 April 2026) rewrote the PME earthing rule in Regulation 722.411.4.1 — the old "not reasonably practicable" exception is deleted, leaving a TT earth electrode, a 70 V open-PEN protective device, or a 207–253 V voltage-limit device as the permitted routes. The 6 mA RDC-DD duty (722.531.3.101, BS IEC 62955) is retained, AFDDs are not required on EV circuits, and bidirectional V2G now invokes the new Regulation 551.7.1(c).

1,000+

UK electricians

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer — DP Electrical

Key Takeaways

  • 1Section 722 has been substantially reorganised under A4:2026 — clause numbering is broadly preserved but the technical content of 722.411.4.1 and the RCD/RDC-DD selection at 722.531.3.101 has materially changed.
  • 2Residual Direct Current Detecting Device (RDC-DD) detecting 6 mA smooth DC remains mandatory for AC charge points without inherent isolation, but A4:2026 clarifies its position relative to the upstream Type A RCD and the conditions under which a Type B RCD discharges the duty on its own.
  • 3PME (TN-C-S) supplies feeding outdoor EV charge points may only be used where one of the permitted exception conditions of Regulation 722.411.4.1(b) to (e) is satisfied — typically a 70 V open-PEN protective device, a 207–253 V voltage-limit device, or a dedicated earth electrode (TT) arrangement.
  • 4Outdoor charge points must achieve a minimum IP rating consistent with their installed environment — IPX4 against splashing water as a floor, with practical installations routinely specified at IP54 or IP65 for body and IK08 or higher against mechanical impact.
  • 5Bidirectional charging (V2G / V2H / V2L) is recognised in A4:2026 alongside one-directional charging, and brings additional considerations around protection coordination, loss-of-mains detection, anti-islanding, and EIC documentation.
  • 6The Electrical Installation Certificate (EIC) for an EV charger install must record the earthing arrangement (TN-C-S / TT / TN-S), the protective device types and ratings, the RDC-DD provision, and the inspection and test results — see the Elec-Mate EIC tool for a digital form aligned to A4:2026.
01 · BS 7671 A4:2026 Update

Why Section 722 Was Rewritten in A4:2026

Section 722 — Electric Vehicle Charging Installations — was first introduced into BS 7671 in the 17th Edition and has been re-edited at almost every amendment since. The headline A4:2026 change is to Regulation 722.411.4.1 on the use of a PME supply: the long-standing exception worded around "not reasonably practicable" has been deleted, and indent (a) is gone, so the permitted PME routes are now the explicit protective-device and earth-electrode options at (b) to (e). A4:2026 also makes changes to external influences, RCDs, socket-outlets and connectors, and aligns the section with the new bidirectional-energy rule at Regulation 551.7.1(c).

The reorganisation is not cosmetic. A4:2026 brings Section 722 into line with the latest IEC 61851 series and with the Electric Vehicles (Smart Charge Points) Regulations 2021. It also tightens the link between Section 722 and the rest of BS 7671 — particularly Chapter 41 (protection against electric shock), Chapter 53 (protection, isolation, switching) and the redrafted Regulation 551.7.1 on bidirectional energy flow where solar PV or battery storage is co-located with V2G.

This guide tracks A4:2026 — not earlier amendments

If you are installing under BS 7671:2018+A2:2022 or +A3:2024, the headline rules are similar but a number of clauses differ. For a high-level summary of every A4:2026 change across the whole Standard, see the BS 7671 A4:2026 summary guide. For a full walk-through of Section 722 including everything carried forward from earlier amendments, see the complete Section 722 guide.

Free download

Get the BS 7671 A4:2026 Cheat Sheet — free

Every key change in the 2026 amendment on one page. AFDDs, TN-C-S protection, new schedule columns, model forms. Pinned on your van dash.

  • Every regulation change summarised
  • New model forms (EIC + MEIWC)
  • Free PDF — no subscription

We'll email it once. No spam — unsubscribe any time.

02 · BS 7671 A4:2026 Update

RDC-DD and 6 mA DC Fault Current

Residual Direct Current Detection — detection of a smooth DC residual current of 6 mA or more on the AC side of an EV charge point — is the single clause that has caused more confusion than any other in Section 722. A4:2026 does not abandon the requirement; it sharpens the wording and clarifies how the duty interacts with the upstream RCD.

Regulation 722.531.3.101 requires that, for AC charge points, protection against DC fault currents be provided either by a Type B RCD or by an RDC-DD that disconnects when a smooth DC residual current of 6 mA or more is detected. BS 7671 defines the RDC-DD as a device having at least the functionality of detection and evaluation of 6 mA DC residual currents and switching of the monitored circuit, and the device standard is BS IEC 62955:2018. The RDC-DD is permitted as an integral function of the charge point — and is how almost every commercially available 7.4 kW UK-market unit satisfies the clause. Where the RDC-DD is integral, the upstream RCD may be Type A rather than Type B.

  • A Type AC RCD is not acceptable on an EV charge point circuit — Type AC cannot reliably trip on the pulsating DC components characteristic of single-phase charging.
  • A Type A RCD upstream combined with an integral RDC-DD inside a charge point that detects 6 mA DC and disconnects the supply is the canonical UK domestic arrangement under A4:2026.
  • A Type B RCD upstream may be used in place of the Type A + RDC-DD combination, and is required where the charge point does not have an integral RDC-DD or where the installation is three-phase with no inherent DC isolation.
  • Where multiple charge points share an upstream Type B RCD, discrimination must be considered — see the discrimination section below.
  • The RDC-DD function must remain effective for the life of the installation and must be subject to the periodic test prescribed by the manufacturer; this should be recorded against the EIC and any subsequent EICR.
  • AFDDs are not required on circuits supplying EV charging equipment conforming to the BS EN 61851 series that incorporate socket-outlets or vehicle connectors conforming to BS EN IEC 62196-2 (Regulation 722.421.1.7.201) — a useful clarification given the wider A4:2026 push on arc fault detection.

Confirm the integral RDC-DD on the datasheet before specifying a Type A upstream

Not every EV charge point on the UK market includes an integral RDC-DD that satisfies BS IEC 62955. Some imports and heavy-duty commercial chargers require an external Type B RCD. Always confirm by manufacturer datasheet before specifying the upstream device. The Elec-Mate cable size calculator prompts for the RDC-DD type as part of the design step.

03 · BS 7671 A4:2026 Update

PME (TN-C-S) Earthing and the Open-PEN Problem

The PME (Protective Multiple Earthing) arrangement — known formally in BS 7671 as TN-C-S — is the default UK domestic supply, and the arrangement most likely to cause a dangerous touch voltage on outdoor metalwork during an open-PEN fault. An EV parked on the driveway is bonded to the vehicle chassis through the charging cable; if the supply PEN opens while load is drawn, the vehicle body can rise to a voltage close to line potential. Section 722 has restricted PME for EV charging since the 17th Edition; A4:2026 retains the restriction with refined exception conditions.

Regulation 722.411.4.1 prohibits the use of a PME earthing facility as the means of earthing for the protective conductor contact of a charge point located outdoors (or one that might reasonably be expected to charge a vehicle located outdoors) unless one of the methods (b) to (e) is used. A4:2026 deleted the former indent (a) and the "not reasonably practicable" wording, so the four explicit routes below are now the only compliant ways to keep — or step away from — the PME earth.

  1. Method (b) — TT route. Connect the main earthing terminal to an installation earth electrode via a protective conductor complying with Regulation 544.1.1, sized so that the voltage between the MET and Earth during an open-circuit PEN fault does not exceed 70 V RMS. Annex A722, Item A722.3 gives the formula for the maximum earth electrode resistance (and notes electrodes above 200 Ω may be unstable).
  2. Method (c) — open-PEN protective device. Retain the PME facility but fit a device that disconnects the vehicle from the live conductors and protective earth within 5 s when the voltage between the circuit protective conductor and Earth exceeds 70 V RMS due to an open-PEN fault (it need not operate if the excess lasts under 4 s). The device must provide isolation, be selected per Table 537.4, and reset only when CPC-to-Earth voltage is back below 70 V RMS.
  3. Method (d) — voltage-limit device. A device that disconnects within 5 s when the utilisation voltage between line and neutral rises above 253 V RMS or falls below 207 V RMS, again providing isolation and selected per Table 537.4. This monitors the supply voltage envelope rather than the CPC-to-Earth voltage directly.
  4. Method (e) — equivalent alternative device that gives no lesser degree of safety than (c) or (d), also providing isolation and selected per Table 537.4. Equivalent functionality may be built into the charging equipment itself.

Earth electrode resistance for the TT route is calculated, not guessed

For method (b), the earth electrode resistance is set by the formula in Annex A722, Item A722.3 — chosen so the MET-to-Earth voltage stays at or below 70 V RMS during an open-PEN fault, allowing for single-phase vehicles charging from three-phase points. BS 7671 notes that electrodes above 200 Ω may be unstable, and the design must hold across seasons and soil moisture. A single deep electrode is often sufficient for domestic 7.4 kW; commercial installs should be supported by calculation. See our EV charger installation guide for typical earthing approaches.

The PME restriction does not apply to TN-S supplies (separate earth back to the distribution transformer) — TN-S installations carry no open-PEN risk and may earth the charge point through the existing arrangement. It also does not apply to Protective Neutral Bonding (PNB) supplies, but PNB is a specific DNO arrangement and should be confirmed in writing before relying on it.

There is also a fifth, less common route that sidesteps the PME question entirely: electrical separation under Regulation 722.413. Here a single electric vehicle is supplied from one unearthed source through a fixed isolating transformer complying with BS EN 61558-2-4 — only one charging point may be supplied per transformer (see Regulation 722.413.1.2). Note BS 7671 cautions (NOTE 3 to 722.411.4.1) that creating a TT system as an alternative to PME may itself be inappropriate where sufficient separation from buried metalwork connected to the supply PEN cannot be achieved.

04 · BS 7671 A4:2026 Update

Outdoor IP and IK Ratings

A charge point on a UK driveway must survive rain, hose-down, dust, frost, salt spray near the coast, and accidental impact from car doors, bicycles and tools. The IP rating flows from the external influences assessment in Chapter 32 and Section 522: water splashes from any direction (classification AD4) demand a degree of protection of at least IPX4, which is the floor for an outdoor charge point. A4:2026 made changes to the external-influences requirements of Section 722; the practical specification has tightened above the minimum.

  • IPX4 is the floor for any outdoor charge point enclosure under Section 722. In practice almost all current UK-market units achieve IP54 or IP65 on the body, with the connector face typically certified separately.
  • IK rating — mechanical impact — is not numerically prescribed in Section 722, but Regulation 522.6 (Impact, classification AG) requires the impact risk to be assessed and the equipment selected accordingly. Driveway-mounted units should achieve at least IK08 against accidental knocks.
  • Pedestals and bollard-mounted units in public car parks should consider IK10 against deliberate impact, plus a vehicle impact barrier or bollard where exposed to vehicular movement.
  • Wall-mounted units installed at adult shoulder height typically achieve IK08–IK10 from the manufacturer and do not require additional impact protection in domestic settings.
  • The connector and cable management (tethered or socketed) must be specified to retain the IP rating when stowed — IPX4 for the connector when stowed in the holster is the practical minimum.

Where the charge point is mounted inside a dry, weatherproof, dust-free garage, the indoor IP regime applies and the minimum may be relaxed to IP21. If the garage is used as a wet workshop, has an unsealed roof, or has a permanently open vehicle door, treat it as outdoor for the purpose of Section 722.

05 · BS 7671 A4:2026 Update

Cable Selection for Outdoor EV Chargers

Cable selection for an EV charge point is a standard BS 7671 design exercise, but several factors make the outcome materially different from a domestic socket circuit. The continuous duty cycle of charging, ambient temperature in the run to an outside wall, the protective device type, and the earthing arrangement (TT versus PME) all push the cable size up.

  • 32 A circuit for a 7.4 kW single-phase charge point — minimum 6 mm² thermoplastic twin-and-earth on a short run, but most installs use 10 mm² to give thermal headroom and voltage drop margin, particularly where the run from the consumer unit to the charge point exceeds 15 metres.
  • Three-phase 22 kW charge points require careful cable design — 32 A per phase is typical, and the cable size should be checked against grouping, ambient temperature and the cable installation method.
  • Where the circuit is run buried underground from house to garage or outbuilding, SWA (steel wire armoured) cable to BS 5467 or BS 6724 with appropriate gland and earth tail is the canonical choice.
  • Cables installed in conduit or trunking outdoors must be UV-stable or shielded from UV by the containment; standard thermoplastic insulation will degrade in direct sunlight over time. Regulation 522.11 covers the solar-radiation (AN) and ultraviolet external influence that drives this choice.
  • Voltage drop must be checked under continuous load — Appendix 4 of BS 7671 is the reference. For domestic installations a maximum voltage drop of 5% is the consumer-installation default and a 6 mm² cable on a 25 m run at 32 A is typically inside that limit.

Use the calculator for the specific design

The cable size that satisfies BS 7671 for a given EV charger install depends on length, load, install method, ambient temperature, grouping, and protective device. The Elec-Mate cable size calculator for EV chargers walks through all of these inputs and outputs a recommended size with the calculation visible.

Try Elec-Mate free for 7 days

16 certificate types, 70+ calculators, RAMS, quoting, invoicing, AI agents, and 46+ training courses — from £6.99/mo.

Start free trial
Download on the App StoreGet it on Google Play
06 · BS 7671 A4:2026 Update

Bidirectional Charging — V2G, V2H, V2L

Bidirectional charging — Vehicle-to-Grid (V2G), Vehicle-to-Home (V2H) and Vehicle-to-Load (V2L) — is the headline new content in A4:2026. Previous editions implicitly assumed power flow from grid to vehicle; A4:2026 explicitly recognises that the vehicle may also act as an export source under control of an inverter integral to or external to the charge point.

A bidirectional charge point behaves like a hybrid between a Section 722 charge point and a generator interface. It must meet the EV charging duties when importing and the generator-side duties when exporting. A4:2026 redrafted Regulation 551.7.1 and added a new indent (c) requiring a suitable protective device wherever energy flow is bidirectional — the same rule that now governs PV and battery inverters that can export. The practical effect: protective devices, isolation, anti-islanding and loss-of-mains detection must satisfy the more onerous of the import and export cases.

  • Loss-of-mains detection — a V2G inverter must detect loss of grid supply and disconnect within the time prescribed by ENA G99 (or G98 for smaller installations). The disconnection time applies whether the vehicle is currently exporting or idle.
  • Anti-islanding — the V2G system must not export into a de-energised section of the network. This is functionally identical to the requirement for a solar PV inverter and is typically certified by the manufacturer to the G99/G98 family.
  • Protective coordination — under the new Regulation 551.7.1(c), a suitable protective device must be provided where energy flow is bidirectional, and it must remain effective under both import and export current directions. Direction-independent Type B RCDs are the standard choice; Type A is generally not suitable for bidirectional V2G.
  • Earthing — the open-PEN considerations of Regulation 722.411.4.1 apply equally to bidirectional installations. The earthing arrangement does not change just because power direction reverses.
  • EIC documentation — the certificate must record that the installation is bidirectional and reference both the EV charging regulations and the bidirectional-energy protection duty of Regulation 551.7.1(c). See our smart EV charging overview for how V2G is gated and certified.

DNO notification is non-negotiable for V2G

A V2G install that can export to the grid must be notified to the local DNO under ENA G98 (up to 16 A per phase) or pre-approved under G99 (above 16 A per phase). Connecting a V2G charge point without DNO notification is non-compliant regardless of how well the BS 7671 design is executed.

07 · BS 7671 A4:2026 Update

Type B versus Type A RCD Selection

The choice between Type A upstream (paired with an integral RDC-DD inside the charge point) and Type B upstream (covering DC fault current on its own) is the single most important protection decision on an EV charging install. Both routes are permitted by A4:2026; the choice is driven by the charge point hardware, the wider installation, and the cost-and-discrimination trade-off.

  • Type AC — NOT acceptable on any EV charge point circuit. A Type AC RCD cannot reliably detect the pulsating DC components characteristic of single-phase charging, and should not even be fitted upstream of a Type A, Type F or Type B device because it can impair their intended operation.
  • Type A + integral RDC-DD — the dominant UK domestic arrangement. The upstream Type A RCD covers AC and pulsating DC fault current; the integral RDC-DD (to BS IEC 62955) inside the charge point handles smooth DC fault detection at 6 mA. Cheapest route, acceptable for any charge point with a certified RDC-DD.
  • Type B RCD upstream — covers all AC, pulsating DC and smooth DC fault current on its own. Required where the charge point has no integral RDC-DD, where several charge points share one RCD without individual RDC-DDs, or where a three-phase charge point lacks inherent DC isolation. More expensive, but no reliance on the unit’s internal device.
  • Type F — designed for frequency-controlled loads; not the default for EV charging but referenced alongside Type A and Type B in the device-selection notes. Specify only where the equipment manufacturer calls for it.
  • Tripping characteristics are not interchangeable — a Type B may trip on a fault a Type A would never see, so the upstream selection, discrimination and nuisance-tripping behaviour must be designed together, not swapped after the fact.

The quick decision: integral RDC-DD or not?

If the charge point datasheet confirms an integral RDC-DD certified to BS IEC 62955, a 30 mA Type A RCBO upstream is compliant and is the standard UK domestic choice. If it does not — or the install is three-phase without inherent DC isolation, or several points share one device — move to a Type B upstream. Confirm on the datasheet before ordering the consumer unit, not on site.

08 · BS 7671 A4:2026 Update

Discrimination With Upstream Protective Devices

Discrimination — the principle that a fault should be cleared by the nearest protective device only — is a normal Chapter 53 duty, but for EV charging it carries a specific risk. A Type A RCD on the EV circuit will sit in the same consumer unit as the other house RCDs. A fault on the EV circuit must not trip the whole house, and a fault elsewhere must not trip the EV circuit and disrupt charging overnight.

  • A dedicated RCD per EV charge point circuit is the canonical UK domestic arrangement — typically a 32 A or 40 A RCBO with Type A characteristic and 30 mA tripping current.
  • Where the consumer unit has a main switch only and one RCD per row of circuits, the EV circuit should ideally be on its own row or its own dedicated RCBO to avoid loss of charging when an unrelated circuit faults.
  • Selective (Type S) RCDs upstream may be considered where multiple downstream 30 mA RCDs are used — Type S provides a time delay that allows the nearest device to trip first.
  • A Type B RCD upstream feeding multiple Type A + RDC-DD downstream charge points requires careful selection — the Type B will trip on DC fault current that the downstream Type A will not see, but the integral RDC-DD inside the downstream charge point will trip first on the 6 mA DC threshold.
  • Where charge points are part of a larger commercial installation (workplace, fleet, public car park), the discrimination scheme should be documented in the design and referenced on the EIC. See our workplace EV charging overview for typical multi-point arrangements.
09 · BS 7671 A4:2026 Update

Inspection, Testing and the EIC

Every new EV charging installation requires an Electrical Installation Certificate (EIC) under Part 6 of BS 7671. The EIC is the same form as for any new addition, but Section 722 imposes specific items that must be recorded — and A4:2026 has tightened the wording on several of them.

  1. Earthing arrangement — TN-C-S (with the exception condition under 722.411.4.1 explicitly named), TT (with the local earth electrode resistance recorded), or TN-S (with the supply earth confirmed in writing by the DNO).
  2. Protective device — the type, rating and breaking capacity of the upstream RCD or RCBO, and the type (Type A, Type B) and tripping current (typically 30 mA).
  3. RDC-DD provision — whether the charge point includes an integral RDC-DD to BS IEC 62955, and the manufacturer model number.
  4. Open-PEN protection — if the PME earthing route under 722.411.4.1(c) or (d) is used, the device model number, the disconnection threshold (70 V RMS CPC-to-Earth, or the 207–253 V RMS band), and confirmation it provides isolation and is selected per Table 537.4.
  5. Inspection results — visible inspection of cable terminations, glands, IP rating, IK protection, mechanical security, identification of circuits, and confirmation of correct labelling at the consumer unit.
  6. Test results — continuity of CPC, insulation resistance (Line-Earth, Neutral-Earth and Line-Neutral with the charge point disconnected), polarity, earth fault loop impedance Zs, RCD operating time at IΔn and 5×IΔn, and where applicable the RDC-DD test using the procedure prescribed by the manufacturer.
  7. Functional test — confirmation that the charge point energises the vehicle correctly, that the contactor closes only when the control pilot is established, and (for V2G) that loss-of-mains detection operates correctly.

Use the Elec-Mate EIC tool for A4:2026 alignment

The Elec-Mate EIC tool generates a BS 7671:2018+A4:2026-aligned Electrical Installation Certificate with the EV-specific schedule of inspections and test results pre-filled for the typical 7.4 kW domestic install. The tool prompts for the earthing route, RDC-DD provision, RCD type, and connects to the test results captured in the schedule.

How to Install an EV Charge Point Under A4:2026

The compliant install sequence — from initial survey to EIC sign-off — for a typical UK 7.4 kW single-phase domestic charge point under the reorganised Section 722.

1

Survey the supply and confirm the earthing arrangement

With DNO authority where required, confirm whether the supply is TN-C-S (PME), TN-S, or TT and photograph the service head. For PME supplies, decide now whether the install will use an open-PEN detection device or a local earth electrode under Regulation 722.411.4.1.

2

Size the circuit and select the protective devices

Calculate the cable size against length, load, install method, ambient and grouping. Choose between a Type A RCBO paired with a charge point with integral RDC-DD, or a Type B RCBO covering DC fault detection on its own. Confirm the choice against the manufacturer datasheet for the specific charge point.

3

Install the cable, charge point body and earthing arrangement

Run the cable to the outside location, gland and terminate at the charge point, install the open-PEN detection device or the local earth electrode as specified, and confirm IP rating and mechanical security. Use SWA for buried runs and UV-stable containment for any exposed external cable.

4

Inspect and test the installation

Carry out continuity, insulation resistance, polarity, Zs and RCD timing tests. For the RDC-DD, follow the manufacturer procedure to verify 6 mA DC trip behaviour. For TT installs, measure the earth electrode resistance. Record every result against the EIC schedule.

5

Functional check and customer handover

Use a test vehicle or a charge point test adaptor that simulates the control pilot, confirm the unit energises only on a valid pilot signal, and verify correct RCD trip behaviour. Hand over the EIC, manufacturer documentation, and a customer guide to periodic RDC-DD self-test.

6

Notify the DNO and (for V2G) submit G98 / G99

For a one-directional 7.4 kW charge point, notify the DNO under the EV charging notification process. For V2G or other bidirectional installs, submit a G98 (up to 16 A per phase) or G99 application before energisation, and do not commission the export function until the DNO has acknowledged.

Frequently Asked Questions

What electricians say

Verified reviews from the UK App Store.

One App for Everything!

Elec-Mate is my go to app for business and electrical work. It's feature rich without feeling cluttered. A true all in one app for quotes, certs, calculations, RAMS, EICRs, and more. I use it every day without fail, and it makes my workflow much smoother since I'm not jumping between apps anymore. The price-to-feature ratio is excellent. Any issues I've had, the developer responds within the hour and usually fixes them the same day. 100% recommend.

Apple App Store · GBR

Fantastic app for electricians

I've used the app and the web based version for a while now and it's well worth the investment. If you're an apprentice or experienced Spark give it a go, you won't be disappointed.

Apple App Store · GBR

Absolutely amazing

I've been using Elec-Mate for a while now, and honestly, it's one of the best apps I've ever downloaded. Every aspect of it feels thoughtfully designed, from the clean and intuitive interface to the powerful features that make everything so easy to manage. It's clear that a lot of care and attention went into building this app, and it shows in every detail.

Apple App Store · GBR

Trusted by electricians across the UK

Real feedback from real sparks

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer

Sole Trader · DP Electrical

“I've won two contracts this month because I could turn quotes around same-day with the AI cost engineer.”

Nathan Perry

Electrician · NP Electrical Services

“The study centre got me through my AM2. Mock exams and flashcards are brilliant.”

Jake Pizey

3rd Year Apprentice · Apprentice

7-Day Free Trial — Cancel Anytime, No Hassle

Certify your next EV install correctly under A4:2026

The Elec-Mate EIC tool generates a BS 7671:2018+A4:2026-aligned Electrical Installation Certificate with Section 722 prompts built in — earthing route, RDC-DD provision, RCD type, Zs and RCD timing test results, ready to PDF for the customer. 7-day free trial, cancel anytime.

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical

From £6.99/mo after trial — less than a coffee a week

or download the app
Download on the App StoreGet it on Google Play
7 days free, then from £6.99/moCancel in one tap — no calls, no hassleiOS, Android & WebBS 7671 compliant
16
Certificate Types
70+
Calculators
46+
Training Courses
8
AI Agents

1,000+ electricians · From £6.99/mo after trial

We use cookies to improve the app and measure what works. Cookie Policy