LANDLORDS & AGENTS

Plug-in Solar in Rented and Leasehold Property: What Landlords and Agents Must Check

Plug-in solar became legal for a tenant to self-install on 27 August 2026. Whether your building can take one is a separate question — and it is decided by the external wall construction, not by the flat. This page sets out what to establish, what to put in writing, and where the real work sits.

Free for 7 days · No charge until day 8 · Cancel anytime · Used by 1,600+ UK electricians

10 min readUpdated 2026-09-01Andrew Moore, Founder of Elec-Mate

Written and reviewed by Andrew Moore, founder of Elec-Mate, against BS 7671:2018+A4:2026, IET Guidance Note 3 and the IET On-Site Guide.

ShareXinW
Follow

The short answer

Can a tenant install plug-in solar without permission?

Nothing in the regulations creates a right to. The specification states users are responsible for obtaining any necessary permissions from the owner, landlord, freeholder, managing agent or relevant authority before installation, and for any planning permission or Listed Building Consent.

Whether it is also a breach of the tenancy depends on its terms — usually the clauses on alterations and fixings to the exterior. The building question is separate: cladding and remediation restrictions rule out whole buildings at once.

1,600+

UK electricians

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical · 5 out of 5

Key takeaways

  1. 01Plug-in solar is legal for a tenant to buy and self-install from 27 August 2026 — but that says nothing about whether your lease or tenancy permits it, or whether the building is suitable.
  2. 02The fire restrictions are decided by the building, not the flat: ACM and MCM cladding, HPL cladding, timber cladding and timber balconies are all excluded, as are buildings subject to external wall remediation works.
  3. 03One answer therefore covers every flat in the building at once, which is what makes this efficient to deal with properly rather than case by case.
  4. 04Users are responsible for obtaining permission from the owner, landlord, freeholder or managing agent — the specification says so explicitly, so a tenant proceeding without asking is not following the manufacturer’s instructions.
  5. 05Panels may not be fixed to a wall forming a property boundary between dwellings, and escape routes must be kept clear.
  6. 06Users are also responsible for checking whether the product affects insurance — their own and, where applicable, the building’s.
  7. 07G98 currently permits one device per household, so in a block that is per dwelling, not per building. Notification is the occupier’s duty and runs to the network operator, not to you.

01 · Landlords & Agents

The Short Answer

Since 27 August 2026 a tenant can lawfully buy a plug-in solar kit and install it themselves. That tells you nothing about whether your building can take one, or whether your lease or tenancy permits it.

Three questions decide it, and only one of them is about the flat:

  • Is the building suitable? The fire restrictions rule out several external wall constructions outright, and that answer covers every flat at once.
  • Does the lease or tenancy permit it? Alterations, fixings to the exterior, use of the building fabric.
  • Is the electrical installation in that dwelling suitable? The protective device, the socket, and whether an outdoor socket exists at all.

Nothing obliges you to commission an assessment. But the first and third questions cannot be answered by looking, and a written answer from a competent person is what stands up later.

Free download

Plug-in Solar — What Actually Changed. Free 8-page guide

The limits, the prohibitions, the surfaces you cannot mount on, the RCD question answered from the source, and what the manufacturer is required to tell your tenant. Written for electricians and apprentices.

  • The full mounting and fire restrictions, with sources
  • Recommended vs required, cited to the source
  • Free PDF — print it, share it, pin it up

We'll email it once. No spam — unsubscribe any time.

02 · Landlords & Agents

The Building Decides, Not the Flat

This is the part that makes plug-in solar unusually efficient for an agent to deal with properly. The specification requires the instructions to carry a prominent safety warning that installation is not permitted on:

  • Aluminium composite material (ACM) cladding systems
  • Metal composite material (MCM) cladding systems
  • High-pressure laminate (HPL) cladding systems
  • Timber cladding systems
  • Timber balconies

And a further prominent warning that it must not be installed on buildings subject to external wall remediation works, building safety remediation works, or equivalent restrictions relating to external wall fire safety. Where there is any uncertainty about the construction of the building, the instructions must tell the user to consult the building owner, freeholder, managing agent or other responsible person — which is to say, you.

Two further constraints bite in blocks specifically: panels must not be fixed to walls or other parts of the building that form a property boundary between dwellings, and users are responsible for keeping escape and rescue paths clear. A panel on a balcony that is also an escape route is a different conversation from one on a garden fence.

Establish the external wall construction and the remediation status once, and you have answered every flat in that building — including the ones that have not asked yet.

03 · Landlords & Agents

Permission Is Not the Tenant’s to Give

The specification is explicit, and it is worth quoting to anyone who argues: users are responsible for obtaining any necessary permissions from the property owner, landlord, freeholder, managing agent or relevant authority prior to installation — including agreeing how any costs associated with installation will be apportioned — and for obtaining any necessary planning permission and Listed Building Consent.

So a tenant who installs one without asking is not following the manufacturer’s instructions. Whether they are also in breach of their agreement depends on its terms, but the usual clauses are the ones about alterations, fixing to the exterior, and use of common parts.

Worth knowing on the planning side: the mounting must be reversible and non-permanent, and must not compromise the structural integrity, fire performance or weatherproofing of the building. That is a product requirement, not a planning one — but it is a useful condition to restate when you grant permission.

04 · Landlords & Agents

The Installation Inside the Flat

The building question is yours. The electrical question is about the dwelling, and it is the one most likely to generate actual work.

  • No extension leads. The device plugs directly into a fixed socket-outlet and nothing else — no extension cables, cable reels, multi-way adaptors, RCD adaptors, travel adaptors or plug convertors. The panel is outside; the socket is usually inside. That gap is normally closed by fitting a fixed outdoor socket-outlet, which is electrical work with its own certification. Where the inverter and the socket are both outside, the socket needs IP55 or better.
  • Socket circuits only. Not a lighting circuit, and not a spur feeding fixed equipment such as a cooker or a boiler.
  • The protective device. Type AC is not appropriate where DC components may be present, and bidirectional capability is a separate question from the type marking. The RCD question is set out in full here.
  • Older or unlabelled boards. Where the consumer unit does not use modern protective devices, is not clearly labelled or is of unknown condition, the specification says to seek inspection and assessment by a qualified electrician before installing.
  • No batteries. Battery storage and battery-integrated plug-in solar are outside this route entirely.

05 · Landlords & Agents

Insurance and the Lease

The specification places the duty on the user: they are responsible for checking, before installation, whether the product may affect any relevant insurance arrangements — including their own and, where applicable, insurance covering the property or building.

For a single let that is the tenant’s problem. For a block it is not, because the building policy is yours and the answer is identical for every leaseholder who asks. Raising it once with the insurer and recording the answer turns every subsequent request into a two-minute reply instead of a fresh enquiry.

In the app

Try Elec-Mate free for 7 days

19 certificate types, 70+ calculators, RAMS, quoting, invoicing, AI agents, and 46+ training courses — from £6.99/mo.

06 · Landlords & Agents

One Device Per Household — What That Means in a Block

Engineering Recommendation G98 Issue 2 Amendment 1 2026 currently restricts this to one device per household, and each dwelling is its own household. So a block of thirty flats is thirty potential devices, not one.

The specification itself permits one device per final circuit, and the government has said its approach is to move to one per power circuit subject to corresponding changes to G98 — on the basis that most UK dwellings have at least two power circuits. Treat the current limit as a rule that is expected to loosen rather than a settled position.

Notification runs from the occupier to the distribution network operator, not to you. It is connect-and-notify, with 28 days from commissioning under G98 Form B. Worth making a written condition anyway — along with telling you when the device is removed, because the deregistration obligation runs the same way and is almost universally forgotten.

07 · Landlords & Agents

Answering a Tenant Request in Writing

A reply that holds up covers four things. It is worth having it as a template, because the request will come again.

  • The building. Whether the external wall construction and remediation status permit a panel at all, and where it may and may not be fixed.
  • The agreement. Whether the lease or tenancy permits it, and on what terms.
  • The conditions. Direct connection to a fixed socket only, no extension lead, no battery, no lighting circuit, the supplied label fixed at the consumer unit, and the mounting reversible.
  • The obligations. That they notify the network operator within 28 days, tell you and the operator when it is removed, and check their own contents insurance.

Where the electrical installation itself needs assessing, that is a job for a competent electrician and it produces a document you can keep on file against the flat — which is worth considerably more than a phone call when the question resurfaces in two years with a different tenant.

08 · Landlords & Agents

Social Housing and Larger Portfolios

At portfolio scale the economics invert. Answering these one at a time is expensive; answering them by building is not, because the fire restrictions and the insurance position are properties of the building and the electrical position is usually consistent across dwellings of the same age and specification.

The practical approach is a standing position per building — permitted, permitted with conditions, or not permitted, with the reason recorded — plus a standard conditions list issued with every approval. That turns an unpredictable stream of individual queries into a reference document, and it means the answer given in March is the same one given in November.

It is also worth anticipating the direction of travel. Demand for these will rise, the one-per-household limit is expected to loosen to one per circuit, and the question will arrive more often rather than less.

Plug-in Solar for Landlords — Frequently Asked Questions

What electricians say

Verified reviews from the UK App Store.

One App for Everything!

Elec-Mate is my go to app for business and electrical work. It's feature rich without feeling cluttered. A true all in one app for quotes, certs, calculations, RAMS, EICRs, and more. I use it every day without fail, and it makes my workflow much smoother since I'm not jumping between apps anymore. The price-to-feature ratio is excellent. Any issues I've had, the developer responds within the hour and usually fixes them the same day. 100% recommend.

Apple App Store · GBR

Fantastic app for electricians

I've used the app and the web based version for a while now and it's well worth the investment. If you're an apprentice or experienced Spark give it a go, you won't be disappointed.

Apple App Store · GBR

Absolutely amazing

I've been using Elec-Mate for a while now, and honestly, it's one of the best apps I've ever downloaded. Every aspect of it feels thoughtfully designed, from the clean and intuitive interface to the powerful features that make everything so easy to manage. It's clear that a lot of care and attention went into building this app, and it shows in every detail.

Apple App Store · GBR

Trusted by electricians across the UK

Real feedback from real sparks

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer

Sole Trader · DP Electrical

“I've won two contracts this month because I could turn quotes around same-day with the AI cost engineer.”

Nathan Perry

Electrician · NP Electrical Services

“The study centre got me through my AM2. Mock exams and flashcards are brilliant.”

Jake Pizey

3rd Year Apprentice · Apprentice

7-day free trial

Give the Answer in Writing, Once

Elec-Mate's Plug-in Solar Suitability & Commissioning Certificate assesses the installation and produces a separate one-page decision sheet for a landlord or managing agent — plain English, no regulation numbers, drawn from the same assessment so the two cannot disagree. Join 1,600+ UK electricians. 7-day free trial.

Start your free trial

From £6.99/mo after the trial — no charge until day 8.

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical · 5 out of 5
  • 7 days free, then from £6.99/mo
  • Cancel in one tap — no calls, no hassle
  • iOS, Android and web
  • Built to BS 7671:2018+A4:2026

Or download the app

Download on the App StoreGet it on Google Play
Certificate types
19Certificate types
Calculators
70+Calculators
Training courses
46+Training courses
AI specialists
8AI specialists

1,600+ electricians · From £6.99/mo after trial

We use cookies to improve the app and measure what works. Cookie Policy