Part P requires that notifiable electrical work in dwellings is either self-certified by a competent person scheme member or notified to building control. This guide covers what is notifiable, how self-certification works, and the consequences of getting it wrong.

Free for 7 days · No charge until day 8 · Cancel anytime · Used by 1,000+ UK electricians

12 min readUpdated 2026-06-10Andrew Moore, Founder of Elec-Mate

Written and reviewed by Andrew Moore, founder of Elec-Mate, against BS 7671:2018+A4:2026, IET Guidance Note 3 and the IET On-Site Guide.

ShareXinW
Follow

1,000+

UK electricians

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical · 5 out of 5

Key takeaways

  1. 01Part P of the Building Regulations applies to electrical installations in dwellings and requires that notifiable work is either self-certified by a competent person scheme member or notified to building control before commencement.
  2. 02Notifiable work includes new circuits, consumer unit replacements, all electrical work in kitchens and bathrooms, and new outdoor or outbuilding supplies.
  3. 03Non-notifiable work — such as like-for-like replacement of accessories and additions to existing circuits in most rooms — does not require building control notification.
  4. 04Electricians registered with NICEIC, NAPIT, ELECSA, or another approved competent person scheme can self-certify their work, issuing a certificate directly without involving building control.
  5. 05Failure to notify can create serious problems when selling a property, as buyers solicitors will request evidence of Building Regulations compliance for all electrical work.
  6. 06BS 7671:2018+A4:2026 Reg 411.3.4 now requires RCD protection (≤30 mA) on all domestic AC lighting circuits — every consumer unit replacement must include RCD-protected lighting ways.
  7. 07BS 7671:2018+A4:2026 Reg 421.1.7 recommends the installation of arc fault detection devices (AFDDs) on AC final circuits in dwellings to mitigate fire risk from arc fault currents.

01 · Regulations Guide

What Is Part P of the Building Regulations?

Part P of the Building Regulations (England) sets requirements for the design, installation, inspection, and testing of electrical installations in dwellings. It came into force in January 2005 following a series of house fires and electrocutions caused by unsafe DIY electrical work.

Part P is implemented through Approved Document P, which was revised in 2013 to reduce the scope of notifiable work. The document requires that all electrical work in dwellings is designed and installed to comply with BS 7671 (the IET Wiring Regulations). For certain types of higher-risk work — defined as notifiable work — the installation must either be self-certified by a registered competent person or notified to building control before work commences.

Part P applies to England only. Scotland, Wales, and Northern Ireland have their own separate building regulations: Wales has its own Approved Documents published by Welsh Ministers, Scotland uses Technical Standards and Handbooks, and Northern Ireland has its own Building Regulations (Northern Ireland) Order. Electricians working outside England should consult the relevant devolved authority for the applicable notification and self-certification requirements.

For electricians, understanding Part P is essential. Failure to self-certify or notify building control for notifiable work exposes the homeowner to enforcement action and property sale problems, and damages the electrician's professional reputation.

Free download

Get the BS 7671 A4:2026 Cheat Sheet — free

Every key change in the 2026 amendment on one page. AFDDs, TN-C-S protection, new schedule columns, model forms. Pinned on your van dash.

  • Every regulation change summarised
  • New model forms (EIC + MEIWC)
  • Free PDF — no subscription

We'll email it once. No spam — unsubscribe any time.

02 · Regulations Guide

What Electrical Work Is Notifiable Under Part P?

Approved Document P defines notifiable work as work that requires either self-certification by a competent person scheme member or prior notification to building control. The following types of work in dwellings are notifiable:

  • New circuits — installation of a new circuit from the consumer unit or from a new consumer unit, including new circuits for electric vehicle chargers, heat pumps, battery storage, and outbuilding supplies.
  • Consumer unit replacement — replacing an existing consumer unit (fuse board) with a new one, including upgrading from rewireable fuses to MCBs and RCDs.
  • Electrical work in kitchens — new circuits, additions to circuits, and installation of new accessories in kitchens where the work involves the kitchen circuit. Like-for-like replacement of accessories on existing circuits in kitchens is non-notifiable.
  • All electrical work in bathrooms — any electrical work in a bathroom, shower room, or en-suite (other than like-for-like replacement of accessories on existing circuits) is notifiable. This includes new shower circuits, towel rail supplies, and lighting changes.
  • Outdoor supplies and new garden circuits — new outdoor socket circuits, new garden lighting circuits, and new supplies to outbuildings (garages, sheds, summer houses) are all notifiable.
  • Special locations — work in swimming pools, saunas, and similar special locations defined in Part 7 of BS 7671 is notifiable.

BS 7671:2018+A4:2026 — What Changes for Consumer Unit Replacements

Reg 411.3.4 — RCD protection on lighting circuits (mandatory). A4:2026 introduces a mandatory requirement that, within domestic (household) premises, all AC final circuits supplying luminaires shall have additional protection by an RCD with a rated residual operating current not exceeding 30 mA. Every consumer unit replacement in a domestic dwelling must therefore provide RCD-protected ways for all lighting circuits.

Reg 421.1.7 — AFDDs recommended on AC final circuits. A4:2026 also introduces a recommendation (not a mandate) that arc fault detection devices (AFDDs) be installed on AC final circuits of a fixed installation to mitigate the risk of fire from arc fault currents. Discuss the option with the homeowner when quoting a consumer unit replacement, and record the decision on the EIC.

DNO notification when breaking the meter seal. If the consumer unit replacement requires access to the meter tails or breaking the DNO meter seal, the network operator must be notified and give permission before seals are broken. This requirement is separate from Part P — failure to notify the DNO is the most commonly cited procedural mistake on consumer unit replacement jobs.

The key principle is that notifiable work involves higher risk — either because it creates new circuits that could be overloaded, or because it is in a location where the consequences of an electrical fault are particularly serious (water present, escape route, etc.).

03 · Regulations Guide

Non-Notifiable Electrical Work

Not all domestic electrical work requires notification. Non-notifiable work can be carried out without building control involvement, provided it complies with BS 7671. Common examples of non-notifiable work include:

  • Like-for-like replacement of electrical accessories (sockets, switches, light fittings) anywhere in a dwelling except bathrooms and special locations.
  • Adding additional sockets or fused connection units to an existing ring final circuit in rooms that are not kitchens, bathrooms, or special locations.
  • Replacing a single damaged cable for a single circuit where the circuit protective device is not changed.
  • Installing or upgrading a smoke alarm or carbon monoxide alarm by connecting to an existing circuit.
  • Replacing a like-for-like accessory in a kitchen on an existing circuit (for example, replacing a socket outlet like-for-like). Note that adding new sockets or extending a kitchen circuit is notifiable.

Even for non-notifiable work, all electrical installations in dwellings must comply with BS 7671. The absence of a notification requirement does not mean the work is exempt from technical standards. A Minor Electrical Installation Works Certificate should still be issued for any work that adds to or alters an existing circuit, to provide the homeowner with a record of what was done and to protect the electrician against future liability.

04 · Regulations Guide

Competent Person Schemes: Self-Certification

The most efficient route to Part P compliance for working electricians is membership of an approved competent person scheme. Registered scheme members can carry out notifiable work and self-certify it — issuing the homeowner with a certificate and notifying the local authority automatically, without building control involvement.

Approved Schemes

  • NICEIC (National Inspection Council for Electrical Installation Contracting)
  • NAPIT (National Association of Professional Inspectors and Testers)
  • ELECSA (subsidiary of NICEIC)
  • STROMA Certification
  • BRE Certification

How Self-Certification Works

  • Complete the installation to BS 7671 standards
  • Test the installation and complete an EIC or Minor Works Certificate
  • Issue the homeowner with a Part P self-certification certificate
  • The scheme notifies the local authority within 30 days

Scheme membership involves an assessment of the electrician's technical competence (including a site visit and inspection of previous work), annual registration fees, and compliance with the scheme's audit and complaint procedures. Annual fees range from approximately £200 to £600 depending on the scheme and the number of installers registered. For electricians who carry out regular notifiable domestic work, scheme membership pays for itself quickly in saved building control fees and administrative time.

In the app

Issue Part P certificates on site

Elec-Mate lets you complete Electrical Installation Certificates and Minor Works Certificates on your phone.

05 · Regulations Guide

Building Notice and Full Plans: Non-Scheme Route

If the electrician is not registered with a competent person scheme, the homeowner must notify building control before notifiable work commences. There are two routes:

  • Building Notice

    A building notice is the simpler of the two routes. The homeowner submits a notice to the local authority before work commences. The council will inspect the work on completion and issue a completion certificate if the work is satisfactory. Building notice fees for typical domestic electrical work range from £200 to £400 depending on the council. The council has no obligation to inspect during the work — the inspection is carried out at the end. If the work fails the inspection, the homeowner bears the cost of remediation.

  • Full Plans Application

    A full plans application involves submitting detailed plans and specifications to building control before work commences. The council approves the plans, inspects during the work, and issues a completion certificate. Full plans applications are used for larger and more complex projects. They provide greater certainty that the work will meet requirements, but the process is slower and more expensive than a building notice.

For most domestic electrical jobs, the building notice route is used where the electrician is not scheme-registered. However, the practical reality is that scheme registration is almost always cheaper and faster than using building control. A building notice fee of £200 to £400 per job quickly exceeds a year's scheme membership fee for any electrician carrying out regular domestic work.

In the app

Try Elec-Mate free for 7 days

16 certificate types, 70+ calculators, RAMS, quoting, invoicing, AI agents, and 46+ training courses — from £6.99/mo.

06 · Regulations Guide

Penalties for Not Notifying Building Control

Failure to comply with Part P is a breach of the Building Regulations. The consequences can be serious for both the homeowner and the electrician:

  • Enforcement notice — the local authority can serve an enforcement notice on the homeowner requiring the work to be inspected and brought into compliance, or in serious cases, removed and redone.
  • Property sale delays — buyers' solicitors routinely request evidence of Building Regulations compliance for any electrical work. Without a certificate, the sale can be delayed or the buyer may demand a price reduction or retention.
  • Insurance issues — home insurance policies may not cover damage caused by electrical work that has not been properly certified. This could leave the homeowner liable for the full cost of fire or flood damage.
  • Professional reputation — an electrician who carries out notifiable work without certification damages their professional reputation and may face action from their registration scheme or from trading standards.

The time limit for enforcement action by the local authority is 12 months from the date of completion of the work. However, the property sale consequences can arise at any time, regardless of how long ago the work was done.

07 · Regulations Guide

Part P and Property Sale

Part P compliance is most visibly important when a homeowner sells their property. Conveyancing solicitors for the buyer will ask the seller to declare all electrical work carried out since the property was purchased, and to provide certificates demonstrating Building Regulations compliance for any notifiable work.

If the seller cannot produce the relevant certificates, the buyer's solicitor may require an indemnity insurance policy to be purchased, which protects the buyer if the local authority takes enforcement action. Indemnity policies can cost £100 to £500 per claim and are not a substitute for proper certification — they simply provide financial protection. Some buyers refuse to accept indemnity insurance and require the work to be properly inspected and certified before exchange of contracts.

For electricians, this creates both a risk and an opportunity. Any homeowner who has had notifiable work done without certification faces a problem when they sell. This generates demand for retrospective inspection and EICRs. However, electricians who fail to certify their own work may find themselves called back to rectify the situation at their own expense.

In the app

Never forget to issue a certificate again

Elec-Mate automatically prompts you to issue an EIC or Minor Works Certificate at the end of every job.

08 · Regulations Guide

For Electricians: Part P in Practice

For a working electrician, Part P comes down to three practical questions on every domestic job: Is this work notifiable? Am I registered to self-certify? Have I issued the correct certificate?

EIC Certificate App

Complete your Electrical Installation Certificate on site using Elec-Mate. AI board scanning populates the schedule of circuits automatically. Voice entry for test results. PDF issued to the customer before you leave.

Minor Works Certificate

For additions and alterations to existing circuits, issue a Minor Electrical Installation Works Certificate instantly from your phone. Required for Part P compliance on non-EIC jobs.

AI Regulations Lookup

Not sure if a specific job is notifiable? Elec-Mate's AI assistant can check Part P requirements and BS 7671 regulations for any installation scenario, so you can advise your customer confidently on site.

Frequently Asked Questions About Part P Building Regulations

What electricians say

Verified reviews from the UK App Store.

One App for Everything!

Elec-Mate is my go to app for business and electrical work. It's feature rich without feeling cluttered. A true all in one app for quotes, certs, calculations, RAMS, EICRs, and more. I use it every day without fail, and it makes my workflow much smoother since I'm not jumping between apps anymore. The price-to-feature ratio is excellent. Any issues I've had, the developer responds within the hour and usually fixes them the same day. 100% recommend.

Apple App Store · GBR

Fantastic app for electricians

I've used the app and the web based version for a while now and it's well worth the investment. If you're an apprentice or experienced Spark give it a go, you won't be disappointed.

Apple App Store · GBR

Absolutely amazing

I've been using Elec-Mate for a while now, and honestly, it's one of the best apps I've ever downloaded. Every aspect of it feels thoughtfully designed, from the clean and intuitive interface to the powerful features that make everything so easy to manage. It's clear that a lot of care and attention went into building this app, and it shows in every detail.

Apple App Store · GBR

Trusted by electricians across the UK

Real feedback from real sparks

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer

Sole Trader · DP Electrical

“I've won two contracts this month because I could turn quotes around same-day with the AI cost engineer.”

Nathan Perry

Electrician · NP Electrical Services

“The study centre got me through my AM2. Mock exams and flashcards are brilliant.”

Jake Pizey

3rd Year Apprentice · Apprentice

7-day free trial

Issue Part P Certificates On Site

Join 1,000+ UK electricians using Elec-Mate to issue EICs and Minor Works Certificates on site. AI board scanning, voice test entry, instant PDF — Part P documentation done before you leave. 7-day free trial.

Start your free trial

From £6.99/mo after the trial — no charge until day 8.

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical · 5 out of 5
  • 7 days free, then from £6.99/mo
  • Cancel in one tap — no calls, no hassle
  • iOS, Android and web
  • Built to BS 7671:2018+A4:2026

Or download the app

Download on the App StoreGet it on Google Play
Certificate types
16Certificate types
Calculators
70+Calculators
Training courses
46+Training courses
AI specialists
8AI specialists

1,000+ electricians · From £6.99/mo after trial

We use cookies to improve the app and measure what works. Cookie Policy