Free mock exam

On-street installations — EV Charging Installation Practice

Free topic-focused mock exam: 25 random questions from a pool of 31 on On-street installations, drawn from the wider EV Charging Installation bank. 50-minute timer, 60% to pass, worked explanation on every question. Use this when you've taken the full mock once and want to drill the topics you got wrong.

Questions
25
Time limit
50 min
Pass mark
60% · 15/25
Question bank
31

Free, no sign-up. Retake as many times as you like — different questions each time.

Sample questions

  1. 01A council fits charge points on a residential street with no allocated parking, for anyone to use. What is their position under the Smart Charge Points Regulations 2021?
    • AOut of scope, as they are public charge points
    • BIn scope, but only if each is under 50 kW
    • COut of scope, as councils are exempt bodies
    • DIn scope, as residents are the main users

    Why: The Regulations do not apply to public charge points (reg 3(1)(b)), and the OPSS guide gives on-street charging installed by a local council for a street without allocated parking as an example of a public point. Councils are not an exempt class as such; it is the public use that takes the points out of scope.

  2. 02A council suggests feeding a new on-street charge point from its unmetered street lighting supply to save a meter. What do the Unmetered Supply Regulations 2001 say?
    • AAllowed, provided the point is rated under 7 kW
    • BNot allowed, as charging is not a predictable load
    • CAllowed, once the charge point maker has agreed it
    • DAllowed, as street furniture is always unmetered

    Why: Regulation 3 of the Electricity (Unmetered Supply) Regulations 2001 allows an unmetered supply only where the load is of a predictable nature and is either under 500 W or impractical to meter, and the distributor, supplier and customer all agree. A charge point’s load depends on when cars plug in and how much they take, so it is not predictable, and it is far above 500 W.

  3. 03Where an unmetered supply is allowed for street furniture, whose agreement do the 2001 Regulations require before it is given?
    • AThe local authority and the customer only
    • BThe installer and the electricity supplier only
    • CThe distributor, the supplier and the customer
    • DThe DNO alone, as it owns the network

    Why: Regulation 3(2) says an unmetered supply shall only be given where the authorised distributor, the authorised supplier and the customer have agreed to it. Disputes go to the Authority under regulation 4. The installer is not a party to that agreement.

Common questions

Is the On-street installations mock exam free?

Yes, it is free with no sign-up needed. Questions are pulled at random from a substantial bank, with a worked explanation on every question after you submit.

Can I retake the mock exam?

Yes. Every attempt picks a different random selection and reshuffles the options, so each retake gives you genuinely new questions. No limit on retakes.

Does this count as a qualification?

No. This is independent practice material and does not award a qualification, card or certificate. Where a subject has a formal qualification or card, you gain it through an approved provider.

Certificate types
19Certificate types
Calculators
70+Calculators
Training courses
46+Training courses
AI specialists
8AI specialists