Free mock exam

Panel building — Industrial Electrical Practice

Free topic-focused mock exam: all 30 questions on Panel building, drawn from the wider Industrial Electrical bank. 35-minute timer, 70% to pass, worked explanation on every question. Use this when you've taken the full mock once and want to drill the topics you got wrong.

Questions
30
Time limit
35 min
Pass mark
70% · 21/30
Question bank
30

Free, no sign-up. Retake as many times as you like — the questions are reshuffled, with the answer order changed.

Sample questions

  1. 01A water company orders a stand-alone motor control centre for a pump house. It is not part of any machine. Which standard is the assembly itself normally built to?
    • ABS 7671, the wiring regulations for the site
    • BBS EN 60204-1, the machine electrical standard
    • CBS EN IEC 61439-2, the assembly standard
    • DBS EN 60529, the enclosure protection code

    Why: BS EN IEC 61439-2 covers power switchgear and controlgear assemblies such as switchboards, motor control centres and stand-alone control panels. BS 7671 is the tempting answer, but it covers the installation that feeds the assembly, not the assembly itself. BS EN 60204-1 is for the electrical equipment of a machine, and BS EN 60529 only defines the IP code.

  2. 02The enquiry for a new panel gives no prospective fault current for its point of connection. How does BS 7671 434.1 allow that figure to be found?
    • AOnly by measuring it on site with a loop tester
    • BBy calculation, by measurement or by enquiry
    • COnly by calculating it from the supply cable size
    • DOnly from the rating the panel maker declares

    Why: 434.1 requires prospective fault current to be determined at every relevant point, by calculation, measurement or enquiry. Measurement alone is tempting, but it is only one of the three routes. The panel’s declared rating is what the fault current is compared against, not where it comes from.

  3. 03A client’s specification asks for a “fully type-tested” control panel. How should you read that against the current standard?
    • AOld BS EN 60439 wording; now design and routine verification
    • BIt means each panel built gets its own short-circuit withstand test
    • CIt is the current BS EN IEC 61439 name for routine verification
    • DIt means the panel must be tested to BS 7671 Part 6 in the works

    Why: Type-tested and partially type-tested belong to the superseded BS EN 60439 series. The current 61439 series works by design verification from the original manufacturer and routine verification by the panel builder on every panel. Reading it as a short-circuit test on each panel is tempting, but withstand is proved once in design verification, not on every assembly.

Common questions

Is the Panel building mock exam free?

Yes — 100% free, no sign-up needed. Questions are pulled at random from a substantial bank, with a worked explanation on every question after you submit.

Can I retake the mock exam?

Yes. Every attempt picks a different random selection and reshuffles the options, so each retake gives you genuinely new questions. No limit on retakes.

Does this count towards the real qualification?

No — this is independent practice material. To gain the actual qualification you need to sit the official assessment through an approved provider.

Certificate types
19Certificate types
Calculators
70+Calculators
Training courses
46+Training courses
AI specialists
8AI specialists

2,320+ electricians and apprentices · from £6.99 a month

We use cookies to improve the app and measure what works. Cookie Policy