Polarity is not a general instruction to “check the wiring”. It is three specific verifications, plus a check at the origin. BS 7671 Regulation 643.6 first requires that, where relevant, the polarity of the supply at the origin of the installation is verified before the installation is energised, and that where single-pole switching devices are not permitted in the neutral conductor, a test is made to verify all such devices are connected in the line conductor(s) only. It then lists what must be verified during the test itself.
| 643.6 | What must be verified |
|---|
| (a) | Every fuse and single-pole control and protective device is connected in the line conductor only. |
| (b) | In circuits having an earthed neutral conductor, centre contact bayonet and Edison screw lampholders have the outer or screwed contacts connected to the neutral conductor — except for E14 and E27 lampholders complying with BS EN 60238. |
| (c) | Wiring has been correctly connected throughout the installation. |
Where polarity sits in the test sequence
Regulation 643.1 requires the tests of Regulations 643.2 to 643.6, where relevant, to be carried out in that order before the installation is energised — 643.2 continuity of conductors, 643.3 insulation resistance, 643.4 protection by SELV, PELV or by electrical separation, 643.5 insulation resistance/impedance of floors and walls, and 643.6 polarity. Polarity is therefore the last of the five dead tests. Where the installation incorporates an earth electrode, the test of Regulation 643.7.2 is also carried out before energising.